Hengsheng PrecisionPrecision machining Request a quote

CNC turning and turn-mill: shafts, fittings and gear blanks

Bar and chuck work with milled features kept in the same setup on a turn-mill centre, so a flat, a cross hole or a gear tooth form does not add a second clamping and a second datum.

Turn-mill±0.02 mm diameterBar and chuck work
01

Turning versus turn-mill

The decision is about how many setups the part needs, not which machine spins faster.

Pure turned partOne setup

Diameters, grooves, threads, chamfers and a faced end. Bar-fed machines run these unattended, so the price is dominated by cycle time and bar stock.

Turned plus cross featuresTurn-mill

Flats, radial holes, slots and axial holes done on the same spindle. Keeping them in one setup avoids a second datum and typically saves 15–30% against a separate milling operation.

Turned plus a gear or splineTurn-mill or hobbing

Gear blanks and timing gears are turned, then the tooth form is cut or milled. Keeping concentricity between the bore and the pitch circle is the whole job; the tooth profile itself is the easy part.

Tight axial feature from a face the lathe cannot reachShort second op

A brief milling operation referenced from a machined face is more accurate than forcing the feature into the turning setup.

02

Concentricity and tolerance bands

Typical turned-part capability
FeatureStandardHigh precisionNotes
Diameter±0.05 mm±0.02 mmGround or finish turned below that
Coaxiality, two diameters0.03 mm0.01 mmSame setup, or between centres
Roundness0.01 mm0.005 mmGround finish
Length, shoulder to shoulder±0.05 mm±0.02 mmDepends on how it is held
Thread6H/6g4H/4hThread milled for tight class
Surface finishRa 1.6 µmRa 0.4 µmGround or roller burnished
Hardness after treatment—48–55 HRC42CrMo and 4140 gear parts
03

Where turned parts get expensive

Slender partsLength to diameter over 6:1

A Ø10 mm shaft 120 mm long deflects under cutting force. Options are a travelling steady, a lighter pass structure, or grinding after turning. Each appears in the price, and each is cheaper than a bent batch.

Hard jaws on finished surfacesMarking

Chucking on a cosmetic surface needs soft jaws bored to the diameter: a small one-off cost that prevents a batch of scratched parts.

Thin tube wallsUnder 1 mm

Below 1 mm on a Ø50 mm tube the part rings and chatters. A low-melt filling compound or machining from solid both work; both cost more than a 2 mm wall.

Runout on a long shaftOver 0.01 mm

Usually needs machining between centres or a post-grind operation. The drawing should state which end is the datum, or the tolerance is ambiguous.

04

Questions we get on this process

What bar sizes are available?

Common round sizes in aluminium, stainless and brass from Ø3 to Ø200 mm. Sizes outside stock are ordered in, which adds days to the lead time but not much to the unit price on a real batch.

Can you cut left-hand and multi-start threads?

Yes, cut or milled depending on class. Multi-start threads should be called out on the drawing because lead and pitch differ and the inspection method changes.

How is concentricity held across two operations?

By keeping critical diameters in one setup wherever possible. When that is not possible, soft jaws are turned to the first diameter so the second datum is the part itself rather than a chuck face.

Do you make prototype quantities on a lathe?

Yes, from one piece. Bar-fed turning is one of the cheapest ways to make a single shaft because no fixture is needed and setup is measured in minutes.

Turning quote with the bar size and setup count shown.

If your part could be turned rather than milled from a block, the quote will say so. That change alone often halves the material cost.

Request a quote